The authors regret that Fig. 9b in this article incorrectly repeated the RANS results already shown in Fig. 9a, instead of displaying the LES results. Corrected figure below. The authors would like to apologise for any inconvenience caused. [Figure presented]</p
There is an error in figures 1, 2, and 3 (corresponding to Figures 1, 4 and 5 of the original public...
The authors regret that the Order of Authors in this article published in November 2015 is incorrect...
The authors regret that there is a small typological error of the empirical constant b1 in Eq. (19)....
The authors regret that Fig. 9b in this article incorrectly repeated the RANS results already shown ...
The authors regret that erroneously Sytse Koopmans MSc, was not listed as co-author in the original ...
The authors regret that the grant number in the acknowledgement section is incorrect and it should b...
The authors regret 3.4 COMSOL for aquifer modelling page Page 686: [Formula presented] (1) should be...
[No abstract available]This paper was made possible by NPRP grant # [5-209-2-071] from the Qatar Nat...
The authors regret that they have missed during the review process that the legend belonging to figu...
The simulations with economic uncertainty discussed in section 4b of Sokolov et al. (2009) were, by...
The authors regret that a co-author (Nuno Mendes, ISISE, Institute of Science and Innovation for Bio...
Figures in .pdf, .png and .fig format. Figures in .fig format can be opened with MATLAB or other op...
In the version of this Article originally published, a coding error resulted in the erroneous inclus...
The above article was originally published online in Early View on 20 November 2009, and subsequentl...
© 2017 American Meteorological Society. Two errors have been identified in the code used in the work...
There is an error in figures 1, 2, and 3 (corresponding to Figures 1, 4 and 5 of the original public...
The authors regret that the Order of Authors in this article published in November 2015 is incorrect...
The authors regret that there is a small typological error of the empirical constant b1 in Eq. (19)....
The authors regret that Fig. 9b in this article incorrectly repeated the RANS results already shown ...
The authors regret that erroneously Sytse Koopmans MSc, was not listed as co-author in the original ...
The authors regret that the grant number in the acknowledgement section is incorrect and it should b...
The authors regret 3.4 COMSOL for aquifer modelling page Page 686: [Formula presented] (1) should be...
[No abstract available]This paper was made possible by NPRP grant # [5-209-2-071] from the Qatar Nat...
The authors regret that they have missed during the review process that the legend belonging to figu...
The simulations with economic uncertainty discussed in section 4b of Sokolov et al. (2009) were, by...
The authors regret that a co-author (Nuno Mendes, ISISE, Institute of Science and Innovation for Bio...
Figures in .pdf, .png and .fig format. Figures in .fig format can be opened with MATLAB or other op...
In the version of this Article originally published, a coding error resulted in the erroneous inclus...
The above article was originally published online in Early View on 20 November 2009, and subsequentl...
© 2017 American Meteorological Society. Two errors have been identified in the code used in the work...
There is an error in figures 1, 2, and 3 (corresponding to Figures 1, 4 and 5 of the original public...
The authors regret that the Order of Authors in this article published in November 2015 is incorrect...
The authors regret that there is a small typological error of the empirical constant b1 in Eq. (19)....